...began the Edith.
This afternoon involved marking out the floor where the strongback will go; deciphering the lines drawing to figure out the actual strongback layout (boat outline less thickness of sides/bottom) marking the plywood centerboard of the strongback and... actually cutting them out and installing them on the floor. There is a notch for each of the eleven stations, and tomorrow's project includes crafting those, inserting them, and square/plumb/leveling the entire beast.
In the close-up I have outlined in red and green the two-piece bowpost that will set into the strongback and somehow join up with the converging chines. Those details of joinery are hidden in the original boat, due to the built-in galvanized hatch-liners. The bad news is I'll have to figure it out. The good news is no one can point out that I did it wrong.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.